The room grew since you measured or the installer measured wrong for whatever reason you do not have enough marble to complete the task. You need more tile! Yesterday as the installer is here and on site.
If more than 5 days have gone by this is now a challenge as that is how quickly we get through lots. We could now be on a completely different lot. By lot we mean shade, color, veining and even size of the tile.
The tiles and mosaics come from blocks of stone. To get the block holes are drilled into the stone on the mountain, water is pumped in at high pressure until “Crack” and the block breaks off. That block is then moved to be cut and processed. When we ship your first order we take as much care as possible to look at each product and match them up as close as possible to each lot. It is a pain staking process.
Lets assume now months have gone by and the block cutting may have moved to the other side of the mountain. The guy in charge of cutting the field tile may have had to replace the saw blades, not a very accurate job (the ...